Kitchen electricity at Málaga
A light strip does not end in the profile seen under the cabinet. Its power supply and connections must have a planned location, especially if the coating is maintained. Hiding equipment behind a fixed cap can make it difficult to replace; it is advisable to identify how it will be reached after assembling the furniture.
Tell us about your kitchen
Choose the type of renovation and the approximate size. Then write to us or fill out the form.
Connections planned before closing the kitchen
- TeamsList of appliances and connection needs.
- Current installationReview of routes and elements that are preserved.
- LinesAdaptations and circuits required by the project.
- PlugsLocation of mechanisms and points of use.
- LightingFeeding and control of the agreed points.
- Final reviewChecks of the work carried out.
Kitchen electricity quote in Málaga
The furniture plan helps to place each shot
Before closing the positions, it gathers the references of the appliances and points out which units remain. The lighting of the worktop is studied next to the use points and their controls. This makes it possible to distinguish connections of fixed equipment from those intended for small appliances used on the surface. See also: worktop lighting.
A partial change must also make the endings clear
If only part of the installation is adapted, the proposal should identify what is reviewed and which finishes are affected. A connection is not considered valid simply because it already exists. You can indicate in the quote for works which tiled and furniture you want to conserve, to assess the electrical reach with those conditions from the beginning.
Quote and scope of work at Málaga
The LED forecast must define the system and its power supply, reserving space for components before evaluating wiring and preparing the points.